B.C. pulls plug on power projects

BC Hydro has cancelled or deferred four electricity purchase contracts with independent power producers, and the total may reach 20

Wind turbine components await construction at independent power project near Chetwynd in 2008. High construction costs stalled B.C.'s first commercial wind energy project

BC Hydro has cancelled or deferred four electricity purchase contracts with independent power producers, and the total may reach 20 by the time a review of projects is complete, Energy Minister Bill Bennett said Thursday.

Bennett said the review is part of a broader effort by BC Hydro to meet his instruction to “spend less money,” as he leads an effort to reduce costs across all government operations.

BC Hydro proposed the move, identifying the 20 project proponents that were not meeting their contract obligations due to financing, regulatory or other problems. That non-performance gives BC Hydro legal authority to delay or terminate contracts.

The utility has contracts with 81 operating projects, mostly run-of-river hydroelectric, and another 47 are under construction or seeking permits after receiving purchase contracts.

BC Hydro released its latest draft resource plan last week, which estimates the province has enough electricity supply to meet growing demand for the next 10 years. Bennett said he is skeptical about that forecast, with population growth and industrial demand from new mines and natural gas development in northern B.C., but it gives the utility some breathing room.

“I’m a real fan of the clean energy industry, but obviously we don’t want to be agreeing to buy more power than what we need,” Bennett said.

BC Hydro has been criticized in recent years for running up billions in deferred debt, as it completes major expansion and seismic upgrading of its network of dams. A new power line to northeast B.C. has run over budget, and the NDP opposition has accused the government of forcing BC Hydro to buy private power at inflated rates through contracts running as long as 40 years.

Bennett said he has asked for a detailed analysis of the cost of private power compared to new sources such as the proposed Site C dam on the Peace River or adding turbines to BC Hydro dams on the Columbia River.

B.C.’s Clean Energy Act requires BC Hydro to be self-sufficient in electricity by 2016, based on an average rainfall year to replenish its hydro dams. The requirement is to minimize the import of power generated by burning coal or natural gas.

Just Posted

Free firework safety courses coming to the West Shore right before Halloween

No permit? You could be fined anywhere between $100 and $10,000

Vendors open doors to new futures at Black Press Extreme Education & Career Fair

More tham two dozen employers, educators signed on for Victoria event

Persons Day to be marked with literary readings in Sidney

Peninsula authors to read from their new books relating to women and courageous journeys, Oct. 18

Fairfield-Gonzales residents aim to establish senior care phone line

The Fairfield-Gonzales Village would allow seniors living alone to have a direct line to resources

Antimatter 2019: The best in experimental media art comes to Victoria

22nd annual festival of film, performance art and more biggest ever – 120 artists, 30 countries

B.C.’s rural paramedic program expands, with home support

Advanced care ambulance staff added for six communities

‘Save the kids!’ Dorian survivor tells the harrowing story of his Canadian wife’s death

Family held a funeral and placed Alishia Liolli’s remains in a niche at a cemetery in Windsor, Ont.

Okanagan woman, 91, votes at advance polls despite broken hip, shoulder and wrist

Angela Maynard has voted in almost every election during her lifetime

Heiltsuk Nation open first Big House in 120 years in northern B.C.

Opening means the community now has an appropriate space for spiritual and ceremonial events

Singh says NDP would form coalition with the Liberals to stop Tories

Singh was in a Liberal-held riding Sunday afternoon in Surrey where he was pressed about his post-election intentions

‘My heart goes out to the mother’: B.C. dad reacts to stabbing death of Ontario boy

Carson Crimeni, who was also 14, was bullied relentlessly, his dad says

The one with the ‘Friends’ photoshoot: Kelowna group recreates TV show intro

A friend’s departure prompted them to create something that really says, “I’ll be there for you”

Canadian Snowbirds plane crashes before air show in Atlanta

Pilot lands safely after ejecting from jet

Share crash data, private insurers tell David Eby, ICBC

B.C. monopoly makes drivers retrieve their own records

Most Read