Sidney seeks transparency over proposed Beacon building

First significant redevelopment along main street is a five-storey structure

An artist’s rendering (above) of what a proposed five-storey building at Beacon Avenue and 4th Street in Sidney could look like. At left is an overview of the existing block. (Handout)

Updated with clarification on Jan. 2, 2018

A proposed redevelopment of a portion of Beacon Avenue in Sidney has one local politician wanting to take steps to ensure the public knows about it — before anyone thinks of blaming them for slipping the project under the radar.

Councillor Peter Wainwright noted at this week’s Sidney council committee of the whole meeting that the project — a proposed five-storey mixed-use building at the corner of Beacon and 4th Street — is of such significance that it will likely garner a lot of public response. However, because the proponent is only seeking zoning variances and not a full rezoning, it is not subject to a public hearing.

“It kind of looks like a major development to me,” said Wainwright. “But … there’s no public hearing because it’s not a rezoning amendment. We may very well have a lot of people unaware of this going on.”

He added that could lead to some people accusing council of “slipping this under the radar.”

Wainwright said he would like to see council avoid any perception of that, and suggested the project and it’s variance application be advertised twice in the Peninsula News Review. Such ads, he said would make it clear there’s no public hearing, but enable people to find out about it and to learn more.

“There should be absolutely no way of any perception that council was trying to slip this through.”

Wainwright also suggested this could be something council does for every five-or-six-storey multi-use development in town.

Mayor Steve Price said he was worried doing this — essentially changing council’s procedures policy “on the fly” — could put them at legal liability with developers. He said it’s a change to the process and could stop this development application to do a procedure change and then advertise it, adding time to the process.

Sidney’s Chief Administrative Officer Randy Humble said staff would have to look into that, noting that to do so would require council to make a change to the existing procedures bylaw. Wainwright said he thinks it can all be done without stopping the development process.

The rest of council, apart from the mayor, agreed.

What is being proposed for the corner is a five-storey, 35-residential unit and single commercial space building — being eyed early on for a restaurant. Architect Sylvia Bonet with Finlayson Bonet Architects, is seeking variances to the Town’s height limit as well as in the number of parking spaces — reducing the required 44 parking bays to 40.

The building will replace existing structures that are sitting upon contaminated soil. The level of contamination was not discussed this week, but its clean up will be part of the project.

Yet, its height raised issues for some councillors.

“I’m afraid this is going to be precedent setting,” said Coun. Barbara Fallot. “This is one of the first buildings on main street that’s going to be developed.”

She said she cannot support it at five stories. To the north of this site, a five-storey building is already under construction. It was given permission to go higher as it’s providing 54 units of affordable housing.

Price noted that while five or six stories are only allowed in the centre block area of downtown Sidney — mainly for attainable housing — “that doesn’t mean we can’t do it for any other buildings.”

The mayor added this is one of the first projects on Beacon Avenue and he doesn’t want it shut down over the height issue — something he said could shut down development in Sidney “for 20 years.”

“We want the town to grow, to have the family suites … we have to go up a bit. I encourage everyone to have an open mind.”

Price ended up opposing the recommendation to send the project to the next step in the approval process — but only over amendments made by his fellow councillors to ask the developers to re-design some aspects of the building. Those aspects include setting back the fourth and fifth stories further from 4th Street (it’s already significantly set back from Beacon) and adding more pedestrian cover along Beacon.

Fallot was the only other councillor opposed, but the proposal will now proceed to the Advisory Planning Commission review, following the changes asked-for by council this week.

Clarification: An earlier version of this article stated that Mayor Price was worried that changing council’s procedures policy on the fly could put council at “risk” with developers. It has been changed to “legal liability” to better reflect his comments.



editor@peninsulanewsreview.com

Like us on Facebook and follow us on Twitter

Get local stories you won't find anywhere else right to your inbox.
Sign up here

 

The area within the blue line is subject to a redevelopment proposal in the Town of Sidney. (Town of Sidney)

Just Posted

Two-vehicle crash in Langford sends one to hospital Monday morning

Driver sent to hospital with unspecified injuries

Recent arrests skim surface of Victoria’s human trafficking problem

Port city makes desirable place for traffickers flying under the radar

Victoria Canadian Forces member honored with exceptional Rotary Club award

Capt. Jacqueline Zweng is the Western Canada Ambassador of Wounded Warriors Canada

Oak Bay athletes rule the slopes at Island ski and snowboard series

Oak Bay boys take top ski, snowboard honours

B.C. budget expected to stay the course as economic growth moderates

Finance minister said ICBC costs have affected budget

VIDEO: Ottawa wants quick, peaceful resolution to pipeline protests, Trudeau says

The protests have manifested themselves as blockades on different rail lines across the country

Canucks acquire forward Tyler Toffoli from Kings in push for playoffs

Vancouver sends Schaller, Madden, pick to L.A.

New highway proposed between Alberta and B.C.

The route would connect Red Deer to Kamloops

Wet’suwet’en and B.C. government have been talking Aboriginal title for a year

Coastal GasLink says it has agreements with all 20 elected First Nations councils along the 670-kilometre route

Trudeau tightlipped on plan to end protests ‘quickly and peacefully’

The prime minister, who cancelled a two-day trip to Barbados this week to deal with the crisis at home

Canadian standards for coronavirus protection to be reviewed, health agency says

The protocols set out how health workers should protect themselves and their patients

Monday marks one-year anniversary of man missing from Langley

42-year-old B.C. man, Searl Smith, was last seen leaving Langley Memorial Hospital on Feb. 17, 2019

Amtrak warns of delays as railways from Seattle to B.C. blocked by Wet’suwet’en supporters

Coastal GasLink said it’s signed benefits agreements with all 20 elected band councils along pipeline route

Federal emergency group meets on pipeline protests as rail blockades continue

There’s mounting political pressure for Trudeau to put an end to the blockades

Most Read