The Township of Esquimalt approved a 10-storey development at 899 Esquimalt Rd. (File contributed/ Lexi Developments)

Esquimalt approves 10-storey development with ground floor health clinic

The project at 899 Esquimalt Rd. received mixed opinions from local residents

Esquimalt has approved a 10-storey, mixed-use building at the corner of Esquimalt Road and Head Street.

After long negotiations with Lexi Development, which originally proposed 12 storeys, and more than 90 minutes of comments from a public hearing on Nov. 25, council voted 4-3 to approve the plan in its third reading.

The development drew some controversy because in June 2018, Esquimalt changed its Official Community Plan (OCP) to allow a maximum height of six storeys. Lexi Development had already started making plans at this stage.

READ MORE: Proposed 12-storey building in Esquimalt pared down to 10, medical clinic no longer prioritized

In exchange for a height variance Lexi put forward a covenant promising the first two floors of the building (approximately 4,000 sq. ft.) to be reserved as a health clinic. At this point it is uncertain if it will be an urgent and primary care clinic, or a private physicians’ office. Presently a Request For Interest has been put forward to Island Health for the space. In either case, there would be 10 years of subsidized rent for the medical space. Lexi has promised to have either secured one or more tenants before residential sales begin, or provide the Township with $160,000 to help hire someone.

The next eight storeys would be for 69 condominium units.

Lexi has also committed to building a kayak dock in the West Bay Marina (a total of $150,000), five electric car chargers, $30,000 to construct two pedestrian-activated crosswalks and $54,000 to be put toward a temporary clinic space before the clinic is finalized.

ALSO READ: Esquimalt needs urgent health care facility, mayor says

During the public hearing, approximately half of people reported dissent against the building density, while the other half applauded the clinic and residential space.

“This was a challenging one for the community,” said Esquimalt Mayor Barb Desjardins. “It was really indicated in the meeting that no matter which way it went many people would be unhappy. I’m hoping now that everyone can now work toward seeing what the benefits will be for the community from this project.”

Now, the official covenant will be put forward and adopted before development permits are issued.

Lexi Developments hopes the begin demolition this month. Construction should take 14 to 16 months to complete.

nicole.crescenzi@vicnews.com

Like us on Facebook Send a Tweet to @NicoleCrescenzi
and follow us on Instagram

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

‘I’ve fallen through the cracks’: Victoria woman calls herself new face of homelessness

Tonya Alton has had to move almost ten times since a ‘wrongful eviction’ in March

UPDATED: Young deckhands backed out of fatal Arctic Fox II trip just before fishboat departed

Inexperienced twin brothers had ‘gut feeling’ and bailed before going to open ocean

Edward Milne students clean up Whiffen Spit

Volunteers find styrofoam, cigarette butts and a single shoe

Missing python found under vehicle in Victoria

The snake was located more than six kilometres from where it went missing

B.C. records new COVID-19 death, 85 more cases; Horgan calls on celebrity help

This brings the total number of active confirmed cases to 531 across the province

B.C. man who nearly died from COVID-19 reflects on one-month battle

Robert Billyard was in an induced coma to ensure his body would not fight the ventilator to breath

Cowichan’s Dillabaugh checks in from the NHL bubble in Toronto

Flyers’ Duncan-born goalie coach weighs in on hockey restart

Wedding party bear sprayed at Okanagan campsite irks locals

Latest criminal activity at the Meadows leaves locals frustrated

Paramedics fired for allowing patient to crawl for treatment on Downtown Eastside: court documents

The man spent three days in intensive care and three months recovering in hospital from sepsis

Feds seeking private consultant to design firearm buyback program

The ban covers some 1,500 models and variants of what the government considers assault-style weapons

Face masks for teachers can impact learning on young children, experts say

Face coverings, mandatory in most indoor public places across the province, can help limit the spread of COVID-19

Horvat scores 2 as Vancouver Canucks beat Blues 5-2 in NHL playoff opener

Game 2 in best-of-seven series goes Friday night

Most Read