The Ministry of Transportation and Infrastructure reminds motorists that the McKenzie interchange remains an active construction site. Water pooled on the road overnight resulting in early morning lane closures and traffic back-ups for commuters (Photo Courtesy of the Ministry of Transportation and Infrastructure).

Heavy rain overwhelmed temporary drainage measures on McKenzie interchange

Flooded lanes snarled early morning traffic

B.C.’s Ministry of Transportation and Infrastructure (MOTI) says incomplete drainage work is behind early morning flooding that closed lanes beneath the McKenzie interchange project Tuesday morning.

The highway, recently opened to free-flowing traffic, was reduced to single lanes in both directions after water pooled overnight. Pump trucks were brought in to remove the water and the southbound lane was re-opened by 7:45 a.m.

RELATED: Traffic moving under McKenzie interchange after morning flooding cleared

MOTI reminds drivers that the McKenzie interchange remains an active construction site and many elements of the project are not yet completed – including drainage work.

“Due to the staged nature of the project, it was necessary to move traffic to the new alignment prior to finalizing drainage work,” MOTI says. “Temporary drainage measures were put in place, including pumps and ditches.”

The province says heavy rains in the two days before the closures overwhelmed the temporary drainage measures the contractor had in place.

“Until permanent drainage is constructed, the ministry has directed the contractor to ensure proper measures are in place to ensure rainwater is draining effectively.”

READ ALSO: Traffic flows through new McKenzie Interchange configuration Thursday morning

The $96-million McKenzie interchange project began in September 2016 and is expected to be completed by summer 2020. Located in Saanich at Admirals Road and McKenzie Avenue, the project will include a loop ramp, landscaping and transit facilities. Once the biggest bottleneck on Vancouver Island, the project is projected to improve traffic flow, reduce collisions and improve pedestrian and cyclist safety through the area.



nina.grossman@blackpress.ca

Follow us on Instagram
Like us on Facebook and follow us on Twitter.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Hydro pole fire closes portion of Metchosin Road in Colwood

Motorists are advised to avoid the area of Metchosin Road near Royal Bay

Strong winds expected in Greater Victoria Friday evening

Winds are expected to ease Saturday morning

‘We thought it was an earthquake,’ homeowners okay after tree falls

Mature tree falls on roof of Victoria Avenue house

Kids across Canada more at risk of hospitalization from flu this season: doctor

Dr. Theresa Tam said influenza B does not usually peak until February or later

Theft victim confronts suspects with baseball bat on Vancouver Island

RCMP in Nanaimo seek to identify of two people alleged to have used a stolen credit card

Closed mills, housing surge support a positive forecast for lumber industries

B.C. lumber producers have closed mills accounting for 18% of province’s capacity, RBC report says

The Coldest Night of the Year comes to Sooke

National event helps those who are hungry and homeless

Kelowna’s ‘Baby Mary’ finds biological parents after more than 30 years

Geneologist and DNA test helped her connect with her biological parents

SOOKE HISTORY: Remembering Salvatore (Sam) Pasta

Salvatore (Sam) Pasta lived life to the fullest

Clerk bruised, traumatized after armed robbery at Nanaimo liquor store

Few details on male suspect in Wednesday incident, says Nanaimo RCMP

One last blast of winter tonight for parts of the Island before temperatures on the rise

A snowfall warning is in effect Friday including east Vancouver Island.

‘Scariest boat ride of my life’: Passengers trapped by ice on rocky B.C. ferry sailing

The Nimpkish docked in Bella Coola on Jan.12 coated in a thick layer of ice

Most Read