The Ministry of Transportation and Infrastructure released an assessment of the Island Rail Corridor’s condition and says the corridor is in poor to fair condition. (Black Press Media file photo)

Island Rail Corridor needs $700 million in upgrades to get back on track

Ministry of Transportation and Infrastructure assessment says rail is in poor to fair condition

More than $700 million in upgrades and maintenance would be needed to get the Island Rail Corridor – formerly the E&N Rail – up and running again and even more to implement commuter service.

The Ministry of Transportation and Infrastructure (MoTI) released an assessment of the rail corridor on April 28. The entire length of the track was assessed to provide information for use by the government on future potential investment on the route owned by the Island Corridor Foundation.

According to a summary report, overall results show that the railway corridor is in poor to fair condition, with the Victoria section in the poor to fair range and the Port Alberni section in the poor range. Main issues include uncontrolled vegetation in and near the rail corridor and the number of decayed ties exceeding regulations set out by Transport Canada.

READ ALSO: Island Corridor Foundation joins partnership pursuing rail

The report says single shoulder plates and angle joint bars used on the corridor are also considered “older technology” and negatively impact track performance.

Bridges are anywhere between poor to good condition depending on the age, location and type of bridge. At-grade crossings are in a fair condition but in some cases, are overgrown with vegetation or require improved warning systems.

Improvements have been recommended based on a phased approach which was developed as part of the MoTI study. It entails three phases.

The first phase includes costs to upgrade infrastructure to re-establish freight and passenger service of about two to four passenger trains per day and two to four freight trains per day. This phase is estimated to cost $326,448,391.

READ ALSO: Island Corridor Foundation ‘cautiously optimistic’ about rail line reactivation

The second phase would further upgrade infrastructure and accommodate increased freight and passenger volumes at higher speeds. There would be four to eight passenger trains per day and four freight trains per day with up to 4 million tonnes in weight per year or 133 cars per day total. This phase, combined with the initial phase, is estimated to cost $552,023,932.

The third phase would support even higher freight and passenger volumes and is optimal for the implementation of a commuter rail service, which has its own costs. This phase, including the costs of the two previous phases, would bring the total to $728,778,304.

Implementing commuter rail service would add an additional estimated $595,029,867. It would involve work such as signalling upgrades, land acquisition, a maintenance facility and phased improvements on the Victoria to Langford corridor.

MoTI is currently developing a South Island Transportation Strategy, focusing on the efficient movement of people and goods. The strategy will look at all modes of transportation across southern Vancouver Island, including rail, and is expected to be released in June.

shalu.mehta@blackpress.ca


Like us on Facebook and follow us on Twitter

railwayTransportation

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Langford pitches Westhills as Canadian Premier League soccer hub

Langford could host all eight teams for August matches

Cancelled cruise ships costs Victoria more than $130 million

Transport Canada bans ships until end of October in response to COVID-19

Point-guard lobs no-look, three-pointer for Oak Bay High video

Trick-shot only took three times, says Oak Bay teen

Saanich residents sound alarm after second owl dies of rat poison

Great Horned Owl found in Kings Park killed by three rodenticides

Person finds bag of drugs while out for walk in Langford

Police ask residents, drivers to check surveillance footage

VIDEO: Victoria dental staff dance to *NSYNC to promote reopening

Urban Smiles staff ‘want you back’ after closure in response to pandemic

Facing changes together: Your community, your journalists

The COVID-19 pandemic has changed the world in ways that would have… Continue reading

Feds looking at ways to reunite families amid COVID-19 border restrictions with U.S.

Some families with members of dual-citizenship have become separated due to the pandemic

B.C. aquaculture farm’s employees sweat it out to raise funds for food banks

For every five minutes of exercise recorded, Cermaq Canada is donating a dollar to local food banks in communities they operate

Condition in kids with possible COVID-19 link being studied in Canada

This month, the U.S. Centers for Disease Control and Prevention issued an alert to doctors about MIS-C

‘I knew what he wanted’: Kootenay man spends hours in tree as black bear patrols below

Francis Levasseur is no stranger to the outdoors, but a recent run-in with a bear caused quite a scare

COVID cancelled their wedding plans, so they married on a BC mountaintop

Ceremony was live streamed to friends and family around the world

Stepdad able to walk bride down the aisle days before he passes away

Ceremony held amidst pandemic in order to fulfill bride’s wish to have stepdad give her away

Trudeau acknowledges racial unrest in U.S.; ‘We also have work to do in Canada’

‘Anti-black racism, racism, is real; it’s in the United States, but it’s also in Canada,’ Trudeau says

Most Read