Repair and temporary dam at Mount Polley Mine near Williams Lake.

Mount Polley design, steep additions led to failure

Glacial layer in dam base not understood, plans to buttress slope put off until weight of water and tailings caused breach

The Mount Polley mine dam failed because of an overlooked glacial material layer in the foundation and a series of steep additions that eventually overcame it, an independent engineering review has concluded.

“Basically the weight of the dam was too much for the weak materials in the foundation to bear,” said U.S. consulting engineer Steven Vick, one of three experts called in to examine the failure that caused the dam to breach and fail in August 2014.

The report concludes that the concrete-like glacial till material in the base of the dam wasn’t understood in enough detail when the dam was designed and built in 1997. Later raising of the dam to hold more water and tailings weakened the base layer and led to the failure.

Vick said the additions to the dam were built at a steeper slope than the original dam, and plans to buttress the area were delayed until it was too late.

Energy and Mines Minister Bill Bennett said the report shows there were no warning signs, and no surface inspections could have detected the problem that was overlooked in the design and original construction.

Two more investigations of the mine failure are pending. Bennett said the Chief Inspector of Mines is likely to release his report by June, and the Conservation Officers’ Service will also report when its investigation is complete.

Bennett said the government is willing to see the Mount Polley mine reopen, but the other investigations must be complete first. The parent company Imperial Metals has applied to use an existing pit to store tailings and resume operations without using the original tailings pond again.

 

Just Posted

“Winter Heart” a musical gift to Sooke

Community Choir’s Christmas offering a thoughtful seasonal concert

Alleged child abduction attempt in Langford a family issue, RCMP say

Const. Matt Baker with West Shore RCMP says parents should not worry

Building permits up, but residential construction softening in Greater Victoria

Greater Victoria led the province in issuing new building permits in August

Wolverines hopeful for deep playoff run

Sooke high school has young ‘talented team’

‘Spread love’: UVic Pride replaces white supremacy posters in Victoria

Around 50 people walked through downtown on Nov. 12 to share posters of love

VIDEO: Amazon to split second HQ between New York, Virginia

Official decision expected later Tuesday to end competition between North American cities to win bid and its promise of 50,000 jobs

Vancouver Island remembers

Important stories shared as Islanders salute those who made the greatest sacrifice

POLL: Have BC Ferry wiats ever forced you to cancel your travel plans?

Many BC Ferry passengers heading out from Swartz Bay to Tsawwassen on… Continue reading

Stink at B.C. school prompts complaints of headaches, nausea

Smell at Abbotsford school comes from unauthorized composting operation

Fear of constitutional crisis escalates in U.S.; Canadians can relate

Some say President Donald Trump is leading the U.S. towards a crisis

Racist slur cleaned off memorial at Qualicum First Nation graveyard

Site was hit by vandals on Friday; many immediately offered support and assistance

B.C.-based pot producer Tilray reports revenue surge, net loss

Company remains excited about ‘robust’ cannabis industry

Canada stands pat on Saudi arms sales, even after hearing Khashoggi tape

Khashoggi’s death at Saudi Arabia’s consulate in Istanbul further strained Riyadh’s already difficult relationship with Ottawa

Vancouver Island leadfoot clocked doing 143 km/h in an 80 km/h zone

Driver issued $483 ticket, has vehicle impounded after pinging RCMP radar in Lantzville

Most Read