Skip to content

Otter Point Road work limits traffic access

Work begins Feb. 4, running to March 1

Traffic on Otter Point Road from Sarah Drive to Robinson Road will be closed except to local traffic from Feb. 4 to March 1.

There will be single lane alternating traffic barriers in place. The speed limit will also be reduced to 30 km/h.

The work will be done by Capital Tree Service with work times Monday to Saturday, 8 a.m. to 4 p.m.



editor@sookenewsmirror.com

Like us on Facebook and follow us on Twitter



Kevin Laird

About the Author: Kevin Laird

It's my passion to contribute to the well-being of the community by connecting people through the power of reliable news and storytelling.
Read more