In this Dec. 18, 2020 photo, pipes to be used for the Keystone XL pipeline are stored in a field near Dorchester, Neb. THE CANADIAN PRESS/AP-Chris Machian /Omaha World-Herald via AP

In this Dec. 18, 2020 photo, pipes to be used for the Keystone XL pipeline are stored in a field near Dorchester, Neb. THE CANADIAN PRESS/AP-Chris Machian /Omaha World-Herald via AP

TC Energy halts spending on Keystone XL, says it’s ‘disappointed’ with Biden move

TC Energy said it will stop capitalizing costs, including interest during construction,

Work on the Keystone XL project is being suspended in anticipation of U.S. president-elect Joe Biden revoking its vital presidential permit once he is sworn in, Calgary-based TC Energy Corp. said Wednesday.

The company said it is “disappointed” with Biden’s action expected later today, adding it will overturn extensive regulatory reviews that found the pipeline would transport needed energy in an environmentally responsible way and bolster North American energy security.

It warned the move will lead to the layoffs of thousands of union workers and comes despite its commitments to use renewable energy to power the pipeline and forge equity partnerships with Indigenous communities.

Francois Poirier, who took over as TC Energy CEO at the beginning of the year, said in a statement the company remains committed to growing earnings and dividends through its investments in critical energy infrastructure even if Keystone XL doesn’t go ahead.

“Our base business continues to perform very well and, aside from Keystone XL, we are advancing $25 billion of secured capital projects along with a robust portfolio of other similarly high-quality opportunities under development,” he said.

TC Energy said it will stop capitalizing costs, including interest during construction, effective Wednesday, and will evaluate the carrying value of its investment in the pipeline, net of project recoveries.

It says this will likely result in “substantive” mostly non-cash writedowns in its first-quarter financial results.

Meanwhile, environmental groups applauded Biden’s expected move.

“Killing the Keystone XL pipeline once and for all is a clear indication that climate action is a priority for the White House. This should not come as a surprise to anyone,” said Dale Marshall, national climate program manager for Canada’s Environmental Defence.

“We should take heed when the biggest customer for Canada’s oil kills a pipeline that is already under construction. The Keystone XL pipeline never made sense for either the U.S. or Canada.”

In contrast, Saskatchewan Premier Scott Moe said it’s “incredibly troubling” that TC Energy has suspended work on Keystone XL.

“Now is the time for our nations to strengthen our trading relationship, not erect further barriers to collaborative and sustainable development,” he said in a statement.

The Progressive Contractors Association of Canada said in a news release it is disappointed that Biden is “putting politics before reason” in his anticipated decision to rescind the pipeline permit.

“Pulling the plug on a major project, hours after taking office, is a rocky starting point for re-setting Canada/U.S. relations,” said PCAC president Paul de Jong.

The association, whose member companies employ thousands of Alberta and B.C. construction workers, said the pipeline would have generated as many as 60,000 direct and indirect jobs in Canada and the United States.

On Tuesday, Alberta Premier Jason Kenney urged Prime Minister Justin Trudeau in a phone conversation to continue his efforts to press Biden to allow Keystone XL to proceed.

Kenney’s government has invested $1.5 billion directly in the project, along with loan guarantees, and he has said about $1 billion is at risk if the project is killed.

The 1,947-kilometre pipeline is designed to carry 830,000 barrels a day of crude oil from Hardisty, Alta., to Steele City, Neb. From there it would connect with the company’s existing facilities to reach the U.S. Gulf Coast — one of the world’s biggest oil refining hubs.

TC Energy announced a plan Sunday for the Keystone XL project to achieve net zero emissions by spurring an investment of over US$1.7 billion in communities along the Keystone XL footprint to create about 1.6 gigawatts of renewable electric capacity.

READ MORE: Documents show Biden plans to issue order to cancel Keystone XL on first day in office

The Calgary-based company has also struck a deal with four labour unions to build the pipeline and has an agreement in place with five Indigenous tribes to take a roughly $785 million ownership stake.

Some 200 kilometres of pipe have already been installed for the expansion, including across the Canada-U.S. border, and construction has begun on pump stations in Alberta and several U.S. states.

Biden was vice-president in 2015 when Barack Obama rejected Keystone XL for fear it would worsen climate change.

Trump approved it again in March 2019.

Dan Healing, The Canadian Press


Like us on Facebook and follow us on Twitter.

Want to support local journalism during the pandemic? Make a donation here.

Joe BidenKeystone XL

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

During a press event on March 6, Const. Alex Berube, media relations officer for the West Shore RCMP, addressed a deadly shooting that occurred in Metchosin the night before. (Devon Bidal/News Staff)
VIDEO: One man shot dead in ‘targeted incident’ on Sooke Road

Highway 14 reopens following multi-hour closure for investigation

Victoria man Brett Andersen is asking for people’s help to secure him one of eight free tickets to the moon. (Screenshot/@brettandersen Instagram)
Victoria man wants your help securing a free ticket to the moon

Japanese billionaire offering eight people a trip to the moon

A decade into the 100-year blueprint for restoring the Bowker Creek watershed, Soren Henrich, director of the Friends of Bowker Creek Society, feels positive about the future of conservation and daylighting of the creek. (Nina Grossman/News Staff)
Ten years in, Greater Victoria’s 100-year Bowker Creek blueprint gets a boost

Victoria council passes several restoration recommendations

A resurfacing of the tennis court in Metchosin is being eyed for the community. However, funding opportunities still need to be solidified for the project. (Michelle Cabana/Black Press Media)
Renewed surface eyed for Metchosin tennis court

Funding source must first be solidified in order for project to happen

The James C Richardson Pipe Band marches in a Remembrance Day parade on Nov. 11, 2019 in Chilliwack. Wednesday, March 10 is International Bagpipe Day. (Jenna Hauck/ Chilliwack Progress file)
Unofficial holidays: Here’s what people are celebrating for the week of March 7 to 13

International Bagpipe Day, Wash Your Nose Day and Kidney Day are all coming up this week

The Conservation Officers Service is warning aquarium users after invasive and potentially destructive mussels were found in moss balls from a pet store. (BC Conservation Officers Service/Facebook)
Aquarium users in B.C. warned after invasive mussels found at pet store

Conservation officers were told the mussels were found in a moss ball from a Terrace pet store.

Hockey hall-of-fame legend Wayne Gretzky, right, watches the casket of his father, Walter Gretzky, as it is carried from the church during a funeral service in Brantford, Ont., Saturday, March 6, 2021. HE CANADIAN PRESS/Nathan Denette
Walter Gretzky remembered as a man with a ‘heart of gold’ at funeral

The famous hockey father died Thursday at age 82 after battling Parkinson’s disease

Donald Alan Sweet was once an all star CFL kicker who played for the Montreal Alouettes and Montreal Concordes over a 13-year career. Photo courtesy of Mission RCMP.
Ex-B.C. teacher who was CFL kicker charged with assault, sexual crimes against former students

Donald Sweet taught in Mission School District for 10 years, investigators seek further witnesses

(Black Press Media files)
Medicine gardens help Victoria’s Indigenous kids in care stay culturally connected

Traditional plants brought to the homes of Indigenous kids amid the COVID-19 pandemic

Personal protective equipment is seen in the COVID-19 intensive care unit at St. Paul’s hospital in downtown Vancouver. THE CANADIAN PRESS/Jonathan Hayward
$16.9 million invested to improve worker safety, strengthen B.C.’s food supply chain

Money to be used for social distancing, personal protective equipment, cleaning, and air circulation

More than ever before, as pandemic conditions persist, the threat of data breaches and cyberattacks continues to grow, according to SFU professor Michael Parent. (Pixabay photo)
SFU expert unveils 5 ways the COVID-19 pandemic has forever changed cybersecurity

Recognizing these changes is the first in a series of steps to mitigate them once the pandemic ends, and before the next: Michael Parent

Kevin Haughton is the founder/technologist of Courtenay-based Clearflo Solutions. Scott Stanfield photo
Islander aims Clearflo clean drinking water system at Canada’s remote communities

Entrepreneur $300,000 mobile system can produce 50,000 litres of water in a day, via solar energy

Most Read